Effect of Risk Management Practices on the Implementation of Public Digital Transformation Programs: Evidence from Rwanda's Digital Ambassadors Program
This study examined how risk management practices such as identification, mitigation, and monitoring and reporting influence the implementation success of Rwanda's Digital Ambassadors Program (DAP). This project is the flagship digital-literacy initiative of the Rwanda Information Society Authority (RISA). Using a sequential explanatory mixed-methods design, quantitative data were collected from 282 field-deployed Digital Ambassadors and 35 DAP managers and coordinators, and complemented by key-informant interviews with twelve senior decision-makers. Pearson correlation analysis showed that all three risk management dimensions were significantly and positively associated with implementation success: risk identification (r = .632), risk mitigation (r = .532), and risk monitoring and reporting (r = .762), all p < .001. Multiple linear regression confirmed that the three dimensions jointly explained 60.2% of the variance in implementation success (R2 = .602, F(3, 278) = 139.91, p < .001), with risk monitoring and reporting emerging as the strongest individual predictor (β = .603, p < .001), followed by risk identification (β = .133, p = .021) and risk mitigation (β = .109, p = .025). Qualitative findings pointed to community engagement and inter-institutional coordination, rather than purely technical constraints, as the most pressing unresolved risks. The results indicate that continuous field-level monitoring, more than upfront planning alone, is the primary structural driver of implementation success in public digital-transformation programs delivered in resource-constrained settings, and that risk registers, contingency protocols, and monitoring systems should be formalised and extended into the post-deployment period to secure long-term programme sustainability.
Public-sector digital transformation has moved from a secondary policy objective to a primary lever of socio-economic development, administrative efficiency and inclusive governance (World Bank, 2023; Mergel et al., 2019). Furthermore Janowski, (2015) added that such change is the core driver of sustainable development and governance. High-income economies such as Estonia and Singapore have sustained large-scale digital transformation success by embedding enterprise risk management (ERM) frameworks, including ISO 31000:2018, into public ICT governance, allowing administrators to forecast disruption and maintain service continuity (International Organization for Standardization, 2018; Vassil, 2020). Across low- and middle-income countries, and particularly in Sub-Saharan Africa, ICT for development (ICT4D) interventions face persistently higher rates of implementation failure and post-deployment decay (Heeks, 2020; Omol et al., 2024). Political goodwill and hardware procurement are frequently prioritised while operational risk forecasting and adaptive monitoring remain underdeveloped, producing what Heeks, (2020) terms a "design–actuality gap" between planning assumptions and field realities.
The Government of Rwanda has placed digital transformation at the centre of its national development agenda through Vision 2020, the National Strategy for Transformation (NST1 and NST2), and Vision 2050 (Ministry of ICT and Innovation, 2024). The Rwanda Information Society Authority (RISA) was established to operationalise this agenda, and its Digital Ambassadors Program (DAP) deploys technologically proficient young ambassadors across all thirty districts to deliver community-level digital-skills training and support citizen access to e-government services. The programme has recorded strong headline outcomes, including a rise in Rwanda's national digital literacy rate from below 10% in 2017 to 75.2% in 2024 (Rwanda Information Society Authority [RISA] & Korea International Cooperation Agency, 2026). Yet field-deployed ambassadors continue to encounter operational friction, including severe rural power deficits, device malfunction and bureaucratic delay in approving localised risk responses (RISA, 2022; Nsengimana et al., 2023).
Operationally, the DAP functions through a decentralised delivery chain in which Ambassadors are recruited and trained centrally, then deployed to sectors and villages where they organise citizen training sessions. These Ambassadors then report progress and challenges to district and RISA supervisors on a regular cycle. They are in principle, supported by escalation and contingency mechanisms when field problems exceed their own capacity to resolve. It is precisely this chain that spanning central planning, field delivery and supervisory response, through which risk identification, mitigation, and monitoring and reporting practice must operate if the programme's ambitious national coverage targets are to be met without compromising training quality or citizen outcomes (Almoghames et al., 2023; Shakib et al., 2026).
While Rwandan scholarship has examined digital adoption rates and national ICT policy frameworks in general terms (Twagilimana & Mukamana, 2023), and a recent case study documented gaps in training quality, institutional support and sustainability financing within the DAP (Cheol Jang, 2025), there remains little systematic, quantitative evidence on how risk management practice specifically shapes implementation outcomes in this programme. Risk management in digital transformation is conventionally understood as a cycle of identifying risk, formulating mitigation responses and monitoring residual uncertainty (Hammond & Jones, 2026), yet the relative empirical weight of each stage in a large-scale, decentralised, low-resource public programme has not been established for Rwanda, specifically for community-based digital-inclusion programmes in the region. Closing this gap matters for three reasons: risk management is increasingly treated as intrinsic to digital transformation success rather than a compliance formality (Hammond & Jones, 2026); it enables early detection of implementation threats before they compound into failure (OECD, 2024); and, absent systematic evidence on which practices matter most, public funds and technical assistance risk being allocated to the wrong stage of the risk cycle.
This study accordingly evaluated how risk management practices influence the successful implementation of the DAP at RISA, addressing three specific objectives: to examine the effect of risk identification on DAP implementation success; to analyse the effect of risk mitigation strategies on DAP implementation success; and to assess the effect of risk monitoring and reporting on DAP implementation success. Three corresponding hypotheses were tested, each proposing a significant positive relationship between the respective risk management practice and successful implementation. The study contributes the first field-level, mixed-methods empirical account of the risk architecture underpinning DAP's documented success, and offers evidence-based guidance for RISA, the Ministry of ICT and Innovation (MINICT), and comparable ICT4D programmes elsewhere in Sub-Saharan Africa.
The findings matter to several audiences concurrently. For RISA, they provide an evidence base for prioritising limited management attention and budget across the three risk dimensions rather than distributing resources evenly across identification, mitigation and monitoring activity. For MINICT and central government, they inform how risk-management performance might be incorporated into the national monitoring architecture for NST2's digital-transformation targets. For Digital Ambassadors and field-level coordinators, the findings substantiate a case for strengthening frontline reporting tools and peer support structures. For international development partners co-financing Rwanda's digital agenda, the study offers an independent, field-validated account of the risk practices underlying a widely cited ICT4D success story, supporting due-diligence and continued investment decisions. For the academic community, the study extends Enterprise Risk Management and Dynamic Capabilities scholarship, developed largely in private-sector and large-organisation settings, to a community-based, government-led digital-inclusion programme in a low-income country context.
Risk management in digital transformation
Digital transformation risk is commonly grouped into organisational, human, process, technical and project-specific categories (Iftikhar, 2025). Although technical failure is the most visible risk category, organisational and human factors are frequently the more consequential barriers to programme success. Structural inertia and misalignment between digital strategy and organisational culture are recurrent causes of failure (Alshurideh et al., 2025), while the digital capability and leadership skills of an organisation's own workforce strongly condition whether digital initiatives are sustained (Rizana et al., 2025). As organisations raise their digital maturity, they also expand their exposure to systemic vulnerabilities such as data-driven threats and unpredictable AI-enabled processes (Stefani et al., 2025). In community-based digital-literacy programmes specifically, training quality, capacity-building for field trainers, institutional oversight and the sustainability of financing arrangements recur as central risk themes (Cheol Jang, 2025).
The literature converges on four mechanisms through which risk management practice shapes implementation outcomes. First, systematic identifIcation enables proactive rather than reactive responses to emerging threats (Amazon Web Services, 2025). Second, formulating mitigation strategies creates accountability, typically by assigning ownership of a specific risk to a specific actor (Amazon Web Services, 2025). Third, monitoring and reporting systems enable early detection of at-risk activities, allowing intervention before problems compound, which is especially important in large, geographically dispersed programmes where deterioration can be gradual and locally invisible to central management (OECD, 2024). Fourth, continuous-improvement loops that capture lessons learned from risk events support the ongoing refinement of implementation methods (Falculan, 2023; Amazon Web Services, 2025).
Evidence from comparable public digital-literacy initiatives elsewhere in Sub-Saharan Africa illustrates the cost of neglecting these mechanisms. Kenya's Digital Literacy Programme and South Africa's e-Education strategy both demonstrated that political commitment and hardware procurement are insufficient on their own: operational rollout stalled where infrastructural deficits went unforecast and monitoring systems remained rigid and centralised rather than locally responsive (Atsulu & Ndathi, 2021; Makgato, 2022). These cases reinforce the proposition that the sequencing and quality of risk management practice, rather than the mere existence of a risk policy, determines whether large digital-inclusion programmes translate policy ambition into sustained field-level outcomes.
In the Rwandan context, the risk landscape facing the DAP combines conventional technical risk with distinctive structural features of a decentralised, citizen-facing rollout. Field-deployed Ambassadors report elevated rates of device malfunction and severe power deficits in off-grid rural sectors, compounded by bureaucratic delay in securing supervisory approval for localised interventions (RISA, 2022; Nsengimana et al., 2023). Beyond these operational risks, programme continuity depends on institutional support for oversight and problem-solving, and on the sustainability of the income and incentive structures available to Digital Ambassadors themselves, both of which have been flagged as threats to long-term programme viability (Cheol Jang, 2025). These risk categories map closely onto the identification, mitigation, and monitoring and reporting dimensions examined in this study, providing the empirical basis for treating them as the primary independent variables of interest.
Theoretical foundations and Conceptual framework
This study draws on four complementary theoretical perspectives. Enterprise Risk Management (ERM) theory (Committee of Sponsoring Organizations of the Treadway Commission [COSO], 2017) frames risk identification, mitigation and monitoring as an integrated management cycle rather than isolated compliance activities, and provides the study's core independent-variable structure. Dynamic Capabilities Theory (Barney, 2021) supplies a complementary process lens: risk identification operationalises an organisation's "sensing" capability, risk mitigation its "seizing" function, and continuous monitoring its capacity to "reconfigure" operations in response to field conditions. The Technology Acceptance Model (Davis, 1989) and Diffusion of Innovation Theory contribute a demand-side perspective, explaining why perceived usefulness, ease of use and the pace of citizen adoption condition whether risk-mitigated interventions translate into durable digital-skill uptake. Read together, these frameworks predict that the DAP's implementation success should depend jointly on the adequacy of RISA's internal risk-sensing and response architecture (ERM and Dynamic Capabilities) and on citizen-facing adoption dynamics (TAM and Diffusion of Innovation) that risk management practice is designed to protect. This synthesis positions the present study's three independent variables such as risk identification, risk mitigation, and risk monitoring and reporting, not as an arbitrary survey taxonomy but as the direct operational expression of an organisation's sensing, seizing and reconfiguring capacities, tested here against a single, policy-relevant dependent variable: the successful implementation of a national digital-inclusion programme.
Fig. 1: Conceptual framework of the study.
Research design
The study used a sequential explanatory mixed-methods design combining a descriptive and correlational quantitative phase with a subsequent qualitative phase. The quantitative phase assessed the perceptions of Digital Ambassadors and DAP managers regarding current risk management practices and their statistical association with implementation outcomes. The qualitative phase, comprising key-informant interviews, then explored the institutional and governance mechanisms underlying the quantitative patterns, providing explanatory depth and triangulation.
Population, sample and sampling technique
The target population comprised two stakeholder cohorts within the DAP: the full field-level population of active Digital Ambassadors (N = 2,030) and the population of DAP managers, regional coordinators and IT operations officers at RISA and MINICT (N = 60), for a combined population of 2,090. The Digital Ambassador sample size was determined using Slovin's formula with a 5.53% margin of error, yielding a required sample of approximately 282 respondents. Given the smaller size of the management population, a targeted approach was used instead of a sampling formula, resulting in 35 managers and coordinators participating as key informants with an institutional coverage rate of 58.3%. Multistage sampling was applied: purposive sampling selected RISA management staff directly overseeing DAP operations, while stratified random sampling ensured proportional representation of Digital Ambassadors across Rwanda's districts and provinces. Twelve senior RISA programme directors, district ICT officers and operations managers were additionally selected as key informants for semi-structured interviews. This dual-cohort design was chosen deliberately: Digital Ambassadors provide the field-level, ground-truth perspective on how risk management practices are actually experienced during citizen training delivery, while managers and coordinators hold the institutional vantage point needed to assess policy design, budget allocation and cross-district coordination. Analysing both cohorts, and triangulating their survey responses against the views of senior key informants, allows the study to distinguish risks that are primarily operational and locally visible from those that are primarily institutional and only visible at the programme-management level, a distinction that proves material to the discussion of findings in Section 5.
Data collection Instruments and procedure
Two instruments were used. A structured, closed-ended questionnaire administered to Digital Ambassadors (n = 282) and DAP managers (n = 35) via Google Forms captured Likert-scale data on the prevalence, frequency and perceived effectiveness of risk identification, mitigation, and monitoring and reporting practices, together with implementation-success indicators such as citizen literacy reach, deployment efficiency, beneficiary satisfaction and post-deployment skill retention. A semi-structured key-informant interview guide, administered to twelve senior decision-makers, gathered narrative data on the institutional and governance mechanisms behind the quantitative patterns, including the drivers of delayed mitigation approvals, persistent rural power deficits, budgetary constraints and post-deployment handover arrangements.
The questionnaire was piloted with ten experts, comprising eight RISA management representatives and two academic supervisors, and achieved a Cronbach's alpha of .90, indicating high internal consistency. Data collection followed formal authorisation from the University of Kigali and RISA, and participation was voluntary and informed; questionnaire responses were collected via Google Sheets and imported into SPSS (version 32.0.0) for analysis. The sequencing of instruments: quantitative survey first, followed by qualitative interviews with a purposively selected subset of senior informants, allowed the interview guide to be refined around the specific quantitative patterns that emerged from the Ambassador and manager surveys, strengthening the explanatory value of the qualitative phase relative to a purely parallel mixed-methods design.
Data analysis
Quantitative data were cleaned, coded and tested for reliability before analysis. Descriptive statistics (frequency, percentage, mean and standard deviation) summarised the perceived effectiveness of each risk management dimension. Bivariate relationships between each independent variable and DAP implementation success were tested using the Pearson product–moment correlation coefficient, and the joint predictive effect of the three risk management dimensions was estimated using multiple linear regression, specified as Y = α + β1X1 + β2X2 + β3X3 + ε, where Y is DAP implementation success and X1, X2 and X3 are risk identification, risk mitigation, and risk monitoring and reporting respectively. Multicollinearity diagnostics (tolerance and variance inflation factor) were run prior to interpreting regression coefficients. Interview transcripts were analysed thematically through a three-step coding process, and the resulting themes were triangulated against the quantitative findings. As the design is cross-sectional and correlational, the analysis establishes statistical association rather than causal direction between risk management practice and implementation success; this limitation is addressed directly in the discussion and conclusion.
Respondent profile
The Digital Ambassador sample (N = 282) was drawn from field-based agents across Rwanda's thirty districts; the manager and coordinator sample (N = 35) comprised RISA project managers, ICT officers and programme coordinators. Table 1 summarizes respondent characteristics. The sample was reasonably balanced by gender (57.1% male, 42.9% female) and well educated, with 71.5% holding at least a bachelor's degree. Tenure was evenly split between more experienced Ambassadors (42.9% with four or more years of service) and those with two to three years (42.9%), with a smaller group of newer recruits (14.3% with less than one year), giving confidence that findings are not dominated by either very new or very seasoned respondents alone.
Table 1: Demographic profile of Digital Ambassador Respondents (N = 282).
Risk identification and implementation success
Pearson correlation analysis revealed a moderately strong, statistically significant positive relationship between risk identification strategies and DAP implementation success (Table 2). Practices comprising pre-deployment orientation, structured problem-recognition training and institutional follow-up were associated with a substantially higher likelihood of successful implementation, indicating that districts and cohorts in which Ambassadors are better oriented and trained to recognise field problems early also experience more predictable, on-schedule implementation.
Table 2: Digital ambassadors perceptions on RISA risk management strategies.
Risk identification recorded the highest mean score of the three independent variables (M = 4.26, SD = .61), suggesting that, of the three risk management dimensions examined, RISA's pre-deployment diagnostic practices are the most consistently and positively perceived by field-level respondents, even though as the regression results below show this dimension is not the strongest independent predictor once the other two are taken into account. The null hypothesis of no relationship was rejected.
Interview findings further strengthen these quantitative results (Table 4). More than two-thirds (68.6%) of managers indicated that RISA conducts formal risk assessment workshops before each programme rollout, while an equal proportion reported conducting field visits and connectivity assessments before deployment.
Table 3: The process of risks identification strategies according to DAP projects managers.
Furthermore, 62.9% reported consulting local leaders, district officials, and relevant stakeholders during programme planning, demonstrating that risk identification incorporates both technical assessments and stakeholder engagement. Regarding unforeseen implementation risks experienced during recent programme cycles, managers identified Digital Ambassador turnover (54.3%), poor internet connectivity (51.4%), community resistance (51.4%), logistical constraints (45.7%), and shortages of digital devices (60.0%) as the most significant operational risks. These findings demonstrate that implementation challenges arise from multiple sources, including technical infrastructure, human resources, logistics, and community participation. Encouragingly, 85.7% of managers reported that field reports are regularly reviewed and used to update the programme's risk register, indicating that RISA employs a dynamic rather than static approach to risk identification.
Table 4: Correlation between risk identification strategies and DAP implementation success.
Source: Primary data.
Risk mitigation and implementation success
A survey was conducted between both digital ambassadors in order to ascertain the risk mitigation strategies adopted by RISA during DAP project implementation. The Table 5 shows the results of this survey from digital ambassadors perspectives.
Table 5: Perceptions of Digital Ambassadors on RISA risk mitigation strategies.
According to the data reported in Table 6, the ten risk mitigation items yielded means ranging from M = 2.85 (SD = 1.408) to M = 4.21 (SD = 1.006). The highest-scoring item was training materials translated into Kinyarwanda to mitigate communication barriers (M = 4.21, SD = 1.006), with 81.2% agreement affirming that linguistic adaptation represents RISA's most effectively implemented mitigation measure. This was followed by the existence of a clear process for handling lost, damaged, or stolen devices (M = 4.17, SD = 1.007), appropriateness of district-specific support and resources (M = 4.06, SD = .956), awareness campaigns for reducing citizen resistance to digital adoption (M = 4.04, SD = .948), and security protocols for device protection (M = 3.99, SD = 1.084). The most critically underperforming mitigation item was backup power solutions such as solar panels or power banks in areas without electricity (M = 2.85, SD = 1.408), where 41.9% of respondents either Disagreed or Strongly Disagreed. This is the only item across all three independent variable scales to score below the neutral midpoint, and its high standard deviation signals that access to backup power varies dramatically between districts, with many Ambassadors entirely without power alternatives in areas where outages represent routine implementation threats. To complement these findings DAP managers were asked about the strategies they adopted during DAP project implementation. The Table 6 highlights the strategies for risk mitigation adopted by RISA according to DAP manager.
Table 6: DAP managers' views on RISA risk mitigation strategies.
According to the data reported in Table 6, the ten risk mitigation items yielded means ranging from M = 2.85 (SD = 1.408) to M = 4.21 (SD = 1.006). The highest-scoring item was training materials translated into Kinyarwanda to mitigate communication barriers (M = 4.21, SD = 1.006), with 81.2% agreement affirming that linguistic adaptation represents RISA's most effectively implemented mitigation measure. This was followed by the existence of a clear process for handling lost, damaged, or stolen devices (M = 4.17, SD = 1.007), appropriateness of district-specific support and resources (M = 4.06, SD = .956), awareness campaigns for reducing citizen resistance to digital adoption (M = 4.04, SD = .948), and security protocols for device protection (M = 3.99, SD = 1.084). The most critically underperforming mitigation item was backup power solutions such as solar panels or power banks in areas without electricity (M = 2.85, SD = 1.408), where 41.9% of respondents either Disagreed or Strongly Disagreed. This is the only item across all three independent variable scales to score below the neutral midpoint, and its high standard deviation signals that access to backup power varies dramatically between districts, with many Ambassadors entirely without power alternatives in areas where outages represent routine implementation threats. To complement these findings DAP managers were asked about the strategies they adopted during DAP project implemntation. The Table 6 highlights the strategies for risk mitigation adopted by RISA according to DAP manager.
Table 6: DAP managers' views on RISA risk mitigation strategies.
On the formal process for deploying mitigation strategies, 65.7% of managers reported that identified risks are escalated to senior management for approval, while 62.9% indicated that district coordinators are also empowered to apply mitigation measures directly. A dual-track structure operating simultaneously at hierarchical and devolved levels. Only 28.6% confirmed the existence of pre-approved contingency plans activatable without additional approval, and 8.6% acknowledged ad hoc responses without a formal process. On budget management, 65.7% confirmed a dedicated contingency fund reserved at the start of each rollout and 62.9% reported regular budget reviews with financial controllers to prevent overruns. Notably, 28.6% indicated that mitigation costs are absorbed by reallocating from lower-priority budget lines. This is a reactive mechanism carrying the risk of degrading other programme components. Regarding plan flexibility, 57.1% described the DAP plan as very flexible with district-level adaptive mechanisms, while 37.1% rated it as moderately flexible requiring management approval for changes. The correlation between risk mitigation strategies and DAP implementation success was likewise positive and statistically significant, though somewhat weaker than for identification (Table 7).
The lower mean score for mitigation relative to identification (3.84 versus 4.26) is consistent with qualitative evidence that mitigation, while present, is less consistently applied across risk categories, particularly power and connectivity risk than upstream identification practice, which plausibly constrains the strength of its association with implementation outcomes. This pattern is consistent with the interview finding that only a minority of managers confirmed that pre-authorised contingency protocols exist for common field risks, meaning that when risks are identified, the organisational response is not always as immediate or standardised as identification itself. The null hypothesis was rejected in favour of a significant positive relationship.
Table 7: Correlation between risk mitigation strategies and DAP implementation success. Risk monitoring and reporting and implementation success.
A study was conducted amongst digital ambassadors in order to investigate the strategies for monitoring and reporting risks during DAP project implementation. The results from this survey are reported in Table 8.
Table 8: Perception of Digital ambassadors on RISA risk monitoring and reporting strategies.
Risk monitoring and reporting produced the highest mean scores of all three independent variable scales, ranging from M = 4.11 (SD = .927) to M = 4.62 (SD = .815). The highest-scoring item was the structured weekly reporting system (M = 4.62, SD = .815), where 90.1% agreed the highest agreement rate across all items in the study. Regular progress report submission via structured systems received M = 4.55 (SD = .795) with 90.8% agreement. Supervisor visits to assess training progress scored M = 4.49 (SD = .815), and follow-up after reporting serious problems scored M = 4.44 (SD = .838) with 88.0% agreement. Whether RISA asks about challenges in addition to training numbers received M = 4.43 (SD = .842), affirming that holistic, quality-inclusive reporting is experienced by a strong majority of ambassadors. Reporting tool user-friendliness and accessibility scored M = 4.43 (SD = .821), reflecting strong perceived technical appropriateness of the reporting infrastructure. The lowest monitoring item still clearly above the neutral midpoint was M = 4.11 (SD = .927) for whether reported resource gaps resulted in actual provision of additional support. This modest reduction relative to other monitoring items suggests that while the reporting loop is experienced as communicatively responsive, the translation of reported needs into tangible resource mobilisation is perceived as less consistent, a distinction between communicative responsiveness and material responsiveness with practical significance for programme quality. To complement these findings DAP managers were asked to describe the Risk monitoring and reporting strategies used during DAP project implementation. The results from this study are displayed in Table 9.
Table 9: Risk monitoring and reporting strategies at RISA according to DAP managers.
Risk monitoring and reporting is the most consistently well-rated of the three constructs, with every Ambassador-side item scoring above 4.1 and the structured weekly reporting system rated highest of all items in the entire questionnaire (mean 4.62, SD .815). Follow-up on reported problems (mean 4.44) and reporting-tool usability (mean 4.43) are also strong, indicating that once a problem is reported, Ambassadors generally feel the system is responsive. The manager data show that most districts are monitored through a centralised digital dashboard (68.6%) with citizen-trained counts as the dominant KPI (71.4%), though a notable minority (20.0%) still rely on manual reporting without a dedicated tool highlighting a residual capacity gap. Encouragingly, 88.6% of managers link monitoring data directly to follow-up support and refresher training, suggesting the M&E system feeds back into programme adaptation rather than being purely reportorial. When asked what single change would most improve DAP success, managers converged overwhelmingly on non-technical, relational factors such as community engagement and buy-in (85.7%) and inter-agency coordination (80.0%) instead of technical fixes such as automated alert dashboards (57.1%). This implies that in managers' own assessment, the residual risk to full success is now more social/institutional than technological. Risk monitoring and reporting showed the strongest bivariate association with DAP implementation success among the three dimensions (Table 10, r = .762, p < .001), and recorded a mean of 4.39 (SD = .63), close to the highest of all three independent-variable scales, indicating that this dimension is both strongly and positively perceived and the most closely associated with implementation success at the field level. Interview evidence attributed this strength to the routinisation of weekly structured reporting between Ambassadors and district supervisors, which respondents described as the most reliable and consistently functioning element of RISA's current risk architecture. The null hypothesis was rejected.
Table 10: Correlation between risk monitoring and reporting and DAP implementation success.
Combined predictive effect: multiple regression
Prior to interpreting regression coefficients, multi-collinearity diagnostics confirmed that the three predictors were sufficiently distinct: variance inflation factors ranged from 1.62 to 2.29, and tolerance values from 0.437 to 0.616, both comfortably within conventional thresholds (Table 11). The multiple regression model was statistically significant overall, with the three risk management dimensions jointly explaining 60.2% of the variance in DAP implementation success (R = .776, R2 = .602, adjusted R2 = .597, F(3, 278) = 139.91, p < .001; Table 10).
Table 11: Multicollinearity diagnostics for the regression model.
At the level of individual predictors (Table 12), all three dimensions made statistically significant, independent contributions to implementation success. Risk monitoring and reporting was by far the strongest predictor (B = 0.592, β = .603, t = 10.540, p < .001), followed by risk identification (B = 0.135, β = .133, t = 2.318, p = .021) and risk mitigation (B = 0.100, β = .109, t = 2.255, p = .025). The standardised coefficient for monitoring and reporting indicates that this dimension carries roughly four to five times the predictive weight of identification or mitigation alone, and the resulting empirical model can be expressed as: DAP implementation success = 0.812 + 0.135(risk identification) + 0.100(risk mitigation) + 0.592(risk monitoring and reporting).
Table 12: Regression model summary and analysis of variance (ANOVA).
Dusengimana C, Bazimya S, Munyemana JJ, Barakamfitiye A, Mutesi A. (2026). Effect of Risk Management practices on the implementation of public digital transformation programs: evidence from Rwanda's digital ambassadors program, Int. J. Manag. Account., 8(2), 277-295. https://doi.org/10.34104/ijma.026.02770295